10 kW Triton Diesel Generator TP-P10-T1 International Use
TP-P10-T1
- Standby
- 9.9 kW / 12.4 kVA
- Prime
- 9 kW / 11.2 kVA
Engine Perkins
Commercial & Industrial Power Equipment Worldwide
Caribbean & Central America · Export from the USA
Commercial and industrial generator sets supplied from the United States for projects in Trinidad and Tobago, with 60 Hz international units in our catalog.
Trinidad and Tobago is preselected with its 60 Hz grid frequency. Change anything, or leave it and let our engineers specify the unit.
The public grid in Trinidad and Tobago runs at 60 Hz (Trinidad and Tobago Electricity Commission (T&TEC)). Low-voltage supply is 115/230 V, 230/400 V three-phase and 115 V, 230 V single-phase (Trinidad and Tobago Electricity Commission (T&TEC)). T&TEC states that the supply voltage offered (115/230 V or 230/400 V low voltage; 6.6, 12 or 33 kV) depends on locality and on the Commission's operating convenience. (Trinidad and Tobago Electricity Commission (T&TEC))
Leading sectors named by U.S. Department of Commerce, International Trade Administration (trade.gov): information and communications technology (ICT), medical equipment, agricultural exports, motor vehicles, health and wellness products, machinery, financial technology, security equipment.
Project configuration should be confirmed before ordering: voltage, connection, duty and site conditions are reviewed by our engineers for every quote.
Last reviewed 2026-09-29.
Engineering review required: shown because they are international units listed at 60 Hz. Voltage and configuration are confirmed for your site before quoting.
TP-P10-T1
Engine Perkins
TP-P160-t1-60
Engine Perkins
TP-Y18-T1
Engine Yanmar
TP-P20-T1
Engine Perkins
TP-P30-T1
Engine Perkins
TP-Y35-T1
Engine Yanmar
TP-P45-T1
Engine Perkins
TP-Y45-T1
Engine Yanmar
Matched to the sectors named in the sources above. Other applications: ask our engineers.
Trinidad and Tobago is preselected in every quote you start from this page, and your choices carry through to the quote form.
Start export quoteMajor commercial ports named by Port Authority of Trinidad and Tobago (PATT) include:
Shipping options are quoted according to equipment size, destination and project requirements. You can also arrange collection with your own forwarder. Freight costs, transit times, duties, taxes and customs clearance depend on the shipment and on local rules, and are not guaranteed on this page.
Technical documentation. 44 of the matching units have a generator set specification sheet; engine and alternator data sheets, manuals and brochures are listed on each product page.
View technical documentsYes. Global Generator Supply supplies commercial and industrial generator sets from the United States to customers worldwide. For Trinidad and Tobago, our catalog lists 44 international 60 Hz units from 10–2,500 kW. Sales and export availability are subject to applicable US export laws and compliance review.
Trinidad and Tobago Electricity Commission (T&TEC) lists the grid frequency in Trinidad and Tobago as 60 Hz. A generator should match the frequency of the loads and grid it works with; our engineers confirm frequency and voltage for your site before quoting. T&TEC states that the supply voltage offered (115/230 V or 230/400 V low voltage; 6.6, 12 or 33 kV) depends on locality and on the Commission's operating convenience.
Three-phase low-voltage supply: 115/230 V, 230/400 V (Trinidad and Tobago Electricity Commission (T&TEC)); single-phase: 115 V, 230 V (Trinidad and Tobago Electricity Commission (T&TEC)). Each unit lists its available voltages; tell us your site voltage and connection and our engineers confirm the configuration.
Yes. Every unit lists its standby and prime ratings in both kW and kVA, and the finder and quote form accept either unit.
Units in our catalog that match Trinidad and Tobago's grid use Perkins (24), Doosan (11), Cummins (6), Yanmar (3) engines.
Yes. We supply automatic transfer switches from 100 to 4,000 A, fuel tanks and trailers, and our engineers match them to the generator when you request a quote.
Yes. 44 of the 44 matching units are listed with an enclosed configuration; open units are listed as well.
Yes. Each purchase includes after-sales support for parts and accessories, and our technical support team helps with manuals, diagrams and troubleshooting.
Major commercial ports named by Port Authority of Trinidad and Tobago (PATT) include Port of Port of Spain, Point Lisas. Shipping is quoted on request according to equipment size, destination and project requirements, or you can use your own forwarder.
Use the export quote form: Trinidad and Tobago is already selected. Tell us the power, voltage, application and delivery city; we reply with suitable options, specification sheets and commercial terms.
Caribbean & Central America overview · All countries A–Z · International buyer guide · Export solutions
Tell us about your project and our team can help identify the appropriate generator configuration.