Six Steps to a Generator Installation
The first task, before any installation work, is picking a generator that suits your small business or home. Once you have settled on the size and configuration you need, you can start planning the installation itself.
1. Bring in an installer
The simplest route is to use one installer from the company that sold you the generator. Alternatively, you can split the job into smaller pieces for individual trades such as electricians and plumbers. That approach puts more of the work on the homeowner or business owner, including applying for permits, but it can be faster if your dealer is swamped with orders ahead of winter weather or hurricane season.
2. Pick the site
The spot you choose for the generator should be:
- In line with local code
- Easy to reach for maintenance
- Close to the fuel supply and the electrical connection
- Clear of windows, doors and sources of water
- Away from utility lines and equipment
- Open on every side, overhead included
- Acceptable under homeowners' association rules or any other neighborhood restrictions
To keep it from back-feeding power into the grid, the generator has to be connected through a transfer switch. Where that switch goes depends on where the generator sits, how accessible the spot is, and how your home is wired.
The checklist should also cover where the fuel will come from, which is usually a tank or an existing supply pipeline. The shorter the distance between fuel and generator, the lower the cost of this part of the job. Fuel storage must also follow local codes.
3. Get the permits
Before work goes ahead, your town, your state or your homeowners' insurer may need to approve the plans. An installer supplied by your generator dealer can help here.
4. Lay a concrete pad
Set the generator on a concrete pad. The pad keeps it out of standing water and anchors it in place through storms and natural disasters.
5. Make the connections
With the generator anchored to the pad, it can be hooked up to its fuel supply and, through a transfer switch, to your home. This work belongs with your installer, or with an electrician and a plumber.
After the connections are made, remove any debris from the area and fit an enclosure suited to your climate. In most cases that means fitting rodent guards, and possibly a cold weather kit as well.
6. Inspect everything
Finally, the installer should check every new connection along with the oil and fuel levels. After that, the generator is ready for its break-in period.


